Electrical BIM modeling process: How to Elevate the Construction Process and Simplify Field Work

Electrical BIM modeling process: How to Elevate the Construction Process and Simplify Field Work

ENG

54 года назад

265 Просмотров

As our #1 value focuses on Field execution and its necessities, we are constantly looking for new and improved ways of approaching and facilitating construction. This video serves as a roadmap, outlining our recipe for success in Electrical BIM Construction.

Working closely and collaboratively with all branches from design to installation and prefab allows for a better flow and a greater end-result on all accounts. A key factor is gathering and constantly communicating with Foremen, Engineers, and Technicians to fulfill each and everyone's needs.

Here is how:

1. Drawing Interpretation: At all stages of the process, markups and comments will always come up. From Forman's in the field showing their issues, to design mark-ups to better accommodate new features. We need to take them, understand them, and find the best possible solution to then include them in the model. In case we don’t receive redlines we propose routes and validate them with the Foremen.

2. Thorough Analysis and Review: There are no two projects alike. Each project has its own strategy, Specs, demands, and complications. Ensuring a solid foundation, taking its necessities, NEC requirements and best practices into account will ensure our subsequent modeling it more than up to what is required.

3. Strategic Modeling: With a deep and thorough understanding of the project needs and requirements, we move towards modeling. Bringing unique and time-saving add-ins together with years of experience in the field. Resulting in a model that is adjusted to the demands of the client providing a model that comes as close to reality as possible.

4. Coordination and Implementation: We move on to the most essential step of the BIM process, The Coordination. Here field experience together with a detailed model results in a solution that’s not only feasible but also follows the industry's best practices and our field crew’s requirements.

5. Deliverable Creation: Project’s finish up, the coordinated and detailed model gets presented in comprehensive, fully detailed layouts. Bringing all the information required by the field like schedules, drawings, enlarges and so on. All for a smooth and straight forward construction.